Chevy Tri Five Forum banner
1 - 5 of 5 Posts

·
Registered
Joined
·
1,373 Posts
Discussion Starter · #1 ·
Made a little headway on the master cylinder plumbing, clutch linkage and plumbing. Starting to get busy in this area of the firewall, so I fabbed up a little bracket for the proportioning valve. Hopefully finish up with the lines tonight, and take it all back off to start filling some firewall holes.
 

Attachments

·
Registered
Joined
·
1,373 Posts
Discussion Starter · #5 ·
plumbing is done!

....for the most part anyway. Rear brake line is only ran down the frame rail; have to route exhaust before finishing lines, can't route exhaust until rear floor is chopped out for custom fuel cell. Ahh details, details.....
I did figure out an easy way to put coils in the lines. One of those, "why didn't I think of that sooner" type-things.
Also need to figure out a proper way to mount the ididit steering column. Ididit says to use self tapping screws for the upper dash mount. That doesn't sound too secure to me IMO. Need to mount gauge cluster and lower steering column cover to see if I have room to weld two 5/16ths" nuts to the column for a more secure fit.
 

Attachments

1 - 5 of 5 Posts
Top